Site survery

A thorough solar site survey is the first step one should take to ensure to get the best performance from new solar power system

Few parameters that includes in our site survey are:

  1. Shadow test: To collect maximum sunlight during the day, the solar PV panel should face as much south as possible. The rooftop must be checked for the shadows of trees or adjoining builds etc.,particularly from south direction.
  2. Type of Structure required: Type of Module Mounting structure required for the Solar panel erection. It varies from location to location and depends upon space availability.
  3. Sizing of solar system: Figure out the energy needs of the Building for finding capacity and type of system required i.e. Grid Connected or Hybrid system
  4. Location of Equipment: Where do we locate the Balance of System components? Ex: Inverter, DC Combiner box, AC Distribution Box, Batteries, if required.

Design & BOM

Pragati SunEnergy Solution's Engineering division provide Solar PV Design and Drawing Services. We offered complete detail engineering services for Solar power projects.

List of drawings & documents generally made for SolarPower projects:

  1. Single Line Diagram
  2. Cable Layout
  3. Earthing Layout
  4. Building Foundation layout for GI structure
  5. Module mounting structure assembly
  6. Plant Layout
  7. Bill of quantity preparation